Floor Slip Resistance Testing at Emerald Headingley Stadium Following Redevelopment

Face Consultants Ltd were contracted by Caddick Construction to carry out tests at the Emerald Headingley Stadium to check the slip resistance of the new concrete and resin floor surfaces following a redevelopment to the North/South stand. About The Client:Caddick Construction is a family-owned construction and civil engineering business, delivering high quality projects in a [...]

2019-06-14T14:40:02+00:00 June 11th, 2019|

Fastrack Joint Repairs Keep Esterform Moving

CG Flooring Systems were challenged by Esterform Packaging to complete repairs to their floor whilst they were still operating all within a one-day window. About The Client:Esterform is the UK's largest producer and supplier of polyethylene terephthalate (PET) moulded bottles to the beverage and household product market. The Situation: Esterform’s operation runs 24/7 364 days [...]

2019-05-16T11:27:45+00:00 May 7th, 2019|

Floor Solution Record Breakers

CoGri Australia pulled off a company record for the prep and application of a two-coat floor coating system for one their biggest clients. The Issue Due to operational issues the food distribution centre works 24/7 and is one of the biggest and busiest centres of its kind in Australia. It had an existing epoxy coating that [...]

2017-07-26T11:31:37+00:00 June 2nd, 2015|

Concrete Grinding Ltd Gives Extra

After the success of the last project for a client in 2012, CG returned to a facility near Stuttgart, to carry out ultraflat floor grinding using the Laser Grinder® XPT at their new extension, working once again in collaboration with BS Bodensysteme GmbH, Concrete Grinding’s partner in Germany. The publishing and distribution company’s facility was [...]

2017-04-27T11:08:10+00:00 March 1st, 2014|

Solution Improved Trucks Efficiency

Concrete Grinding Ltd’s narrow aisle floor grinding solution helped to improve their client’s man riser narrow aisle trucks efficiency at a facility in Denham, Uxbridge, UK. Bosch UK head office at Denham, had a challenge with their trucks which were swaying from side to side in aisles due to uneven floor surface. Subsequently, the Linde [...]

2017-04-27T11:08:11+00:00 March 1st, 2014|

Lets Face it On-Site

Face Consultants Australia continues to grow and again this year they have been busier than ever with various on-site supervising roles including the construction of a huge steel fibre floor in Perth for one of Australia’s leading logistics supply chain provider. Constructing industrial warehouse slabs has many challenges, from perfecting the design, through to the [...]

2017-04-27T11:08:12+00:00 March 1st, 2014|

Concrete Grinding Ltd Saves the Day

Concrete Grinding Ltd was awarded an assignment in Bük, Hungary, to put right a flooring project where another company had failed to deliver the precise floor flatness requirements. Unfortunately this type of contract is not unusual for us, as there are very few flooring contractors who can demonstrate a full understanding and proficiency in VNA [...]

2017-04-27T11:08:14+00:00 December 10th, 2013|

Laser Grinding International

Concrete Grinding have been extremely busy in the last quarter with men and machines working and moving all over the world, a logistical challenge that tested the team’s ability to the limit! After completion of a Laser Grinding contract for CoGri Korea, the Laser Grinder® was sent back to Australia to complete a project for [...]

2017-04-27T11:08:15+00:00 December 1st, 2013|

Australia is Flat

CoGri Australia's Laser Grinder® was back in action this quarter grinding 400 linear metres of 3 wheel track grinding for one of the largest global food service equipment suppliers. The project entailed grinding 13 aisles 30.7m long to flatness specification DM3 of TR34 Appendix C. Three wheel tracks were ground to accommodate Jungheinrich narrow aisle [...]

2017-04-27T11:08:17+00:00 March 10th, 2013|