Laboratory Floor Transformation
September 14, 2021
About The Client
For more than 100 years, our client has provided high integrity forgings used in the world’s most demanding applications.
September 14, 2021
About The Client
For more than 100 years, our client has provided high integrity forgings used in the world’s most demanding applications.
September 1, 2021
About The Client
CG Flooring Systems were contacted by our customer, a contractor with a high-profile client base working in several sectors such as Education, Commercial, Retail, Travel and many more.
December 13, 2019
CG Flooring Systems were challenged by the Client to carry out a number of different repairs, removal of racking and ensure the floor was suitable for their desired operation.
June 11, 2019
Face Consultants Ltd were contracted by Caddick Construction to carry out tests at the Emerald Headingley Stadium to check the slip resistance of the new concrete and resin floor surfaces following a redevelopment to the North/South stand.
May 7, 2019
CG Flooring Systems were challenged by Esterform Packaging to complete repairs to their floor whilst they were still operating all within a one-day window.
For a site visit or advice on the best solution, contact the experts.
"We engaged CG Flooring to repair the joints on our..."
Craig AlsopEsterform Packaging
"The solution Face Consultants / CG Flooring provided is hugely..."
DirectorSpecialist Sports Ltd
"Face provide a truly professional and accurate floor tolerance surveying..."
Technical Director Stanford Industrial Concrete Flooring Ltd