Concrete Grinding Ltd worked with partner Qualidal for a construction company, on behalf of a client at their new warehouse facility in France. The project brief required 36 aisles at approximately 70 metres long to be upgraded to meet with TR34 CAT 1 specification.
After an initial floor survey by Qualidal, Concrete Grinding Ltd analysed the report and identified the areas out of specification requiring remedial grinding. This provided a substantial cost and time saving benefit to the construction company, as not all of the floor area within the 36 aisles required grinding. In addition, two Laser Grinders were in operation to speed up grinding work and meet the tight deadline.
The Concrete Grinding Ltd team carried out 3 wheel track grinding to 857 metres of aisle in total. The floor also had 180 steel construction joints and a very hard surface topping to grind through. This made the project more of a challenge. However, the Laser Grinders® are robust and designed to overcome these conditions.
Once the aisles had been ground, Qualidal re-surveyed the floor and provided a report to confirm compliance to TR34 CAT 1 specification.
For a site visit or advice on the best solution, contact the experts.
"Face provide a truly professional and accurate floor tolerance surveying..."
Technical Director Stanford Industrial Concrete Flooring Ltd
"CoGri Middle East LLC (CGME) were appointed to supply &..."
Chief Financial OfficerAl Muqarram Auto Parts Trading, Dubai
"Just to let you know, how pleased I am with..."
Facilities ManagerHomebase