In the past few months, CG Flooring Systems Ltd (CGFS), saw a wide variety of flooring renovation and upgrade requirements.
Work included reducing floor levels and laying a cementitious floor topping at a steel stockholder site. Rectification work was needed as a result of a badly laid concrete floor.
A Joint Repair project worth 19k for Hellmann Worldwide Logistics Ltd, at their Tamworth Logistics Warehouse, was undertaken in August 07. Work was carried out to improve the condition of the floor surface and reduce wear and tear on the forklift trucks.
CGFS is due to start work at a European water heating product supplier in October. The 6,000 m site requires full services from CGFS, which comprise of filling in pits, carrying out joint repairs, and pump-screed floor covering. The foundry site is being converted into a warehouse facility.
CGFS has also won a contract to provide a non-slip surface floor to a major research-based pharmaceutical company. Work covers 9 loading bays. Initially, CGFS was commissioned to complete a test trial on one of their bays. Work is now due to start in September.
For a site visit or advice on the best solution, contact the experts.
"CoGri Middle East LLC (CGME) were appointed to supply &..."
Chief Financial OfficerAl Muqarram Auto Parts Trading, Dubai
"The speed of response from CG Flooring Systems from both..."
DirectorCAM Forklift Trucks Ltd
"I can honestly say I’ve been totally surprised in their..."
Susan SmithKeystore Ltd