September 1, 2009
Concrete Grinding Ltd (CG) began the year with a return trip to Greece to work in partnership with Eurolit at a new facility for BIC-Violex SA in Athens constructed by Techniki Anodos SA.
The Process
See below:
June 3, 2009
Concrete Grinding Ltd and their long-standing partner in Spain, Eurostick S.L. have worked together on a joint project to improve the floors of one of the twelve warehouse facilities that the HEFAME Group, a pharmaceutical distribution cooperative, has in Santomera in the province of Murcia (Spain).
June 3, 2009
Between April to June, the Face Consultants team have been working on projects across the continents.
June 3, 2009
In 2008 Renault Samsung Motors (RSM) started construction of its new Distribution Centre at Haman, near Busan, Korea. As 12,000m2 of the total 23,500m2 floor space would include VNA (Very Narrow Aisle) racking with a maximum lift height of more than 10.0 m, the floor construction was highlighted early by RSM as a critical part of the construction.
June 3, 2009
Al Seer Group (ASG) commissioned FACE Middle East Fzc (FACE ME) to assist in the design and construction of the floor for their new Distribution Centre (DC) in Barka, Oman.