DC Slab Construction Success in Jordan
September 1, 2010
FACE Middle East Fzc completed their FIRST supervision contract for The Modern Arab Distribution Co. Ltd new 4000m2 warehouse facility in Jordan.
September 1, 2010
FACE Middle East Fzc completed their FIRST supervision contract for The Modern Arab Distribution Co. Ltd new 4000m2 warehouse facility in Jordan.
June 1, 2010
LGA Logis has recently completed construction of an 11,500 m2 nominally reinforced SOG (Slab on Grade) floor to a new warehouse for ‘Booksville’ Publishing at Paju, Gyunggi-Do, Korea.
June 1, 2010
CoGri Asia, based in Singapore, has been awarded a contract for the construction of a 56,000 m2 Steel Fibre only Reinforced Slab on Piles (SOP) floor for a global retailer who is building a new distribtion centre on the outskirts of Shanghai, China.
March 1, 2010
Langdon Industries Ltd are a logistics service provider who specialise in controlled temperature operations. Their Bridgwater depot is the centrepiece for their temperature controlled distribution centres throughout the UK. The floor within one of the cold stores was in need of refurbishment to better support their operational requirements.
March 1, 2010
Concrete Grinding Ltd made an excellent start to 2010 by constructing the floor for a warehouse extension project for Deal Distribution International FZE in Dubai, United Arab Emirates.
For a site visit or advice on the best solution, contact the experts.
"We engaged CG Flooring to repair the joints on our..."
Craig AlsopEsterform Packaging
“The construction comprised of a concrete slab floor with a..."
Business Development ManagerQueensland drill core facility
"Linde Material Handling Asia Pacific Pte Ltd recommends the flooring..."
General ManagerLinde Material Handling Asia Pacific