“We engaged CG Flooring to repair the joints on our production hall concrete slab to allow the recently introduced Automated Guided Vehicle units to travel around the area without bouncing over the joints in the production area.
“Michael Feast brought 3 teams to do the work as we were not able to halt production and CG Flooring only had 12 hours to carry out the repairs. The AGV units had been removed from operation this meant all completed stock had to be transported manually. CG Flooring and Esterform produced a plan to minimise impact on the production operation.“All the work was carried out professionally to a high standard and in the allocated time scale with no impact on the production.
“Michael Feast instigated a follow up meeting with Esterform to ensure we were satisfied with the work done. We would use CG Flooring in the future.”
Craig Alsop, Electrical Engineer, Esterform Packaging
For a site visit or advice on the best solution, contact the experts.
"This note is being sent in appreciation for your efforts..."
Project Manager Hewlett-Packard
"Face provide a truly professional and accurate floor tolerance surveying..."
Technical Director Stanford Industrial Concrete Flooring Ltd
"CG Flooring as a division, has done a number of..."
Paul Riley DHL